|
o.n.
|
available locations
|
purpose
|
surface
|
communal equipment
|
|
1.
|
Part of the block behind Factory for pharmaceutical plastic complex and confection factory (leans on road R-125 in vicinity of Belgrade-Bucharest railroad)
|
Working zone in Alibunar
|
approx. 10ha (field in private property)*
|
unequipped
|
|
2.
|
Part of the block within the M 1.9 road Belgrade-Vršac and R125 road Pančevo -Alibunar
|
Working zone in Alibunar
|
approx. 7ha (gardens, partly meadow)*
|
unequipped
|
|
3.
|
Block 6 (abuts on the railroad Belgrade-Bucharest)
|
Working zone in Ban. Karlovac (for silo, storehouses, and other facilities related to railroad
|
3,5ha (state owned land with the rigt to use of MZ and Municipality)
|
|
|
4.
|
Zone across the railroad Belgrade-Bucharest
|
Rsidence-working zone for small economy
|
approx. 10ha (garden)*
|
unequipped
|
|
5.
|
Block 11 within the road M 1.9 and local road Alibunar-Banatski Karlovac
|
Working zone
|
2,5ha
|
|
|
6.
|
Part of the blocks 43-47 which abuts on the road M 1.9 across the road of the block 11
|
Working zone (one facility for facade tiles production)
|
approx. 7ha (the rest of the land is in private property - fields, partly expropriated)
|
|
|
7.
|
Block 15a in Vladimirovac, abuts on the road M 1.9 Belgrade-Vršac-Romania on the entrance of Vladimirovac from Pančevo direction
|
Zone for recreation (construction of motels, sprts courts, and on the one part there is gas station with auto-service)
|
5ha (the rest is being used for agriculture production)
|
|
|
8.
|
Block 52, abuts the road M 1.9 Belgrade-Vršac-Romania on the exit from Vladimirovac towards Vršac
|
Craft zone (for agriculture production)
|
|
|
|
9.
|
On the entrance of Lokve from Alibunar direction, on the road R123 from both sides of the road
|
Working zone in Lokve
|
approx.4ha (meadow, pasture, the right of use for MZ, Municipality)
|
unequipped
|
|
10.
|
The part which is aligned with channel DTD and on the R123, makes the border with Municipality of Plandište
|
Touristic-recreative spa. Construction of spa hotel complex. Possibility for construction phases.
|
38ha (for agriculture production)
|
unequipped
|